FOOTER PADS

We began by figuring out where the footer pads needed to be installed by setting up a string line. We then excavated by hand an area for the footer pads to be installed.

Once the footer pad preparation area was level and in the right spot, we then set up forms for concrete.

The forms are all set up.

After the concrete has been poured, the forms have been striped, and the footer pads have been back filled with gravel to form an apron.
 
 

Graphic Design & Website Design by Off the Page Creations